Document Controller interview

Document Controller interview

Document Controller interview

Basic Documents and Terms

1: RFI (Request for Information).

2: RFI (Request for Inspection).

3: NCR (Non-Conformance Report).

A document issued when work or materials do not meet project specifications or standards, requiring corrective action.

4: INCR (Internal Non-Conformance Report).

5: IR (Inspection Report).

A formal request for quality inspection, materials, or work performed on-site.

6: DR (Deviation Request).

7: TQ (Technical Query).

A document used to ask technical questions related to project execution.

8: MS (Method Statement).

9: MAR (Material Approval Request).

A document used to request approval for materials before using them in the project.

10: ITP (Inspection and Test Plan).

A document that defines the inspection and testing process to ensure compliance with standards.

11: MIR (Material Inspection Request).

A request to inspect delivered materials before use in the project.

12: RFQ (Request for Quotation).

A document requesting pricing and availability details from suppliers.

13: Submittals (Material, Shop, Drawing, samples).

Documents submitted for review and approval before execution.

14: As-Built Drawings. Revised drawing showing the actual construction after project completion.